Unbonded Strand Supplier: A Sourcing Guide for Post-Tensioning Projects

24, Nov. 2026

 

Unbonded Strand Supplier: A Sourcing Guide for Post-Tensioning Projects

Choosing an unbonded strand supplier means evaluating more than the steel strand itself. For a post-tensioning project, buyers should confirm that the strand, corrosion-protective coating, and plastic sheathing match the project specification, then assess documentation, production control, packaging, delivery, and technical support. Common nominal strand diameters include 12.7 mm and 15.2 mm, while 1860 MPa is a commonly specified tensile strength grade; these are examples, not substitutes for the engineer’s design requirements. This guide explains how to compare suppliers and prepare a clear request for quotation.

Please visit our website for more information on this topic.

Key Takeaways

  • Specify the complete unbonded strand assembly, not only the steel strand diameter.
  • Use approved project drawings and specifications to confirm strand grade, coating, sheath, and acceptance requirements.
  • Compare suppliers on traceable quality documents, production capability, packing, delivery planning, and communication.
  • Ask for a quotation based on defined quantities and delivery terms; minimum order quantities and lead times vary by supplier and order.

Who This Guide Is For

This guide is for contractors, post-tensioning subcontractors, distributors, and procurement teams sourcing materials for building or infrastructure work. It is particularly useful when a project requires imported supply, multiple delivery batches, or a technical review before purchase. Engineers and quality teams can also use the checklist to align procurement documents with approved project requirements. Final material selection and acceptance should follow the project design, applicable specifications, and the responsible engineer’s direction.

What Is Unbonded Strand?

Unbonded strand is a prestressing steel strand individually protected by a corrosion-inhibiting coating and a plastic sheath, allowing it to move relative to the surrounding concrete during stressing. In a typical post-tensioning arrangement, the strand is tensioned after the concrete has gained the strength required by the design. The strand transfers force through its end anchorage rather than relying on a continuous bond between the strand and surrounding concrete along its length. Exact system details depend on the design and the post-tensioning system being used.

Components Buyers Should Specify

A purchase description should identify the prestressing strand and its required mechanical and dimensional properties, alongside the coating and sheathing requirements. The sheath protects the coated strand and should be suitable for the project’s installation and handling conditions. Buyers should also clarify whether the order includes strand only or a broader package such as cut lengths, coils, or compatible system components. Do not assume that components from different systems are interchangeable; confirm compatibility with the system supplier and project design.

Types, Materials, and Specification Review

Unbonded strand products can vary by nominal diameter, steel grade, strand construction, coating, sheath material, and supply format. For orientation, 12.7 mm and 15.2 mm are widely encountered nominal diameters in prestressing applications, and 1860 MPa is a commonly specified tensile strength grade. These figures are not universal requirements: the approved drawings and applicable product standards govern what a project can use. Buyers should verify the relevant standard, grade designation, tolerances, and test-document requirements directly against the project documents.

Build a Complete Technical Data Sheet

Before requesting prices, prepare a schedule that identifies diameter, grade, required length or coil format, quantity, and any specified coating or sheath criteria. Include applicable standards and required inspection or test documentation, as well as marking, packaging, and traceability expectations. State whether the material will be accepted through document review, incoming inspection, or another project-defined process. If any specification is unclear or conflicts with the drawings, resolve it with the engineer before placing an order.

Match the Product to the Application

Unbonded strand is used in post-tensioned concrete applications where the design calls for an unbonded tendon system. Project conditions can differ significantly, including member geometry, tendon routing, exposure, installation sequence, and site storage. These conditions influence the required system details and handling controls, but they do not authorize a supplier to alter the design. Share relevant project information with prospective suppliers so they can identify questions and confirm what they can supply against the stated requirements.

For more information, please visit DALU.

Check System Compatibility Early

Confirm that the strand and any associated components are specified for the intended post-tensioning system. Clarify responsibilities for tendon fabrication, installation, stressing, and inspection, because these may be split among the material supplier, specialist subcontractor, and contractor. Ask who will review technical submittals and how changes will be approved. Early alignment can reduce the risk of ordering material that meets a general description but does not satisfy the project’s system or documentation requirements.

A Practical Supplier Selection Framework

  1. Check technical fit. Ask the supplier to respond to each line of the project specification, including grade, dimensions, coating, sheath, and required records.
  2. Review quality controls. Request relevant product data, inspection or test documents, and an explanation of how production batches are identified and traced. Confirm document formats and review timing before shipment.
  3. Assess supply capability. Discuss available production formats, order quantity, packaging, delivery destination, and the ability to coordinate phased deliveries. Ask what needs to be confirmed before the supplier can commit to a schedule.
  4. Evaluate communication and support. Identify a contact for technical questions, document revisions, and shipment updates. A responsive process is important when procurement depends on engineering approval.

For a fair comparison, send the same technical schedule and commercial assumptions to each supplier. Separate confirmed facts from assumptions in the quotation, including whether freight, packaging, duties, or other charges are included. Ask suppliers to list deviations rather than treating silence as confirmation of compliance. This makes it easier for engineering and procurement teams to compare offers on a like-for-like basis.

Pricing, Minimum Order Quantity, and Lead Time

Unbonded strand pricing is influenced by the specified product, order volume, packaging, production availability, destination, and logistics. Minimum order quantities are supplier-specific and may depend on the requested size, production setup, or whether the order is supplied in coils or cut lengths. Lead time can also vary with stock position, manufacturing workload, inspection, document approval, and transport arrangements. We recommend asking for a written quotation that separates the validity period, production estimate, shipment estimate, and delivery assumptions.

Information to Include in an RFQ

Provide the project specification or relevant excerpts, a quantity schedule, requested delivery location, and target delivery window. State the required product format and whether partial shipments are acceptable. Identify required documentation and any review or inspection steps that must happen before dispatch. If you need alternatives, ask the supplier to quote them separately and clearly identify any technical differences for engineering review.

Common Sourcing Mistakes to Avoid

  • Quoting only a diameter: A diameter alone does not define grade, protective system, documentation, or packaging.
  • Assuming standards are interchangeable: Confirm that the proposed product and evidence meet the exact standards and acceptance criteria named in the project documents.
  • Leaving delivery terms vague: Define the destination, requested timing, packing expectations, and shipment responsibilities before comparing prices.
  • Approving substitutions informally: Route proposed changes through the project’s technical approval process before purchase or installation.
  • Ignoring site handling: Plan receiving, storage, and inspection so material identification and protective packaging can be maintained until use.

How DALU Supports Buyers

At DALU, we work with buyers to understand the specified product, order quantity, delivery destination, and required documentation before preparing a quotation for unbonded strand supply. We can review the information provided and identify questions that should be resolved before an order is finalized. Where a request includes project-specific requirements, we encourage buyers to share the relevant specification and confirm that any proposed product details receive the required approval. Availability, order conditions, and delivery timing are confirmed against the details of each inquiry.

To help us prepare a useful response, include the strand diameter and grade, applicable standard, coating and sheath requirements, quantity, supply format, destination, and requested delivery window. Attach drawings or specification excerpts where permitted, and identify any required inspection or documentation. Our team can then clarify the scope and provide a quotation for review. The project’s engineer and post-tensioning system specialist should remain responsible for design decisions and final technical acceptance.

Conclusion: Choose a Supplier Against the Project Requirements

The right unbonded strand supplier is one that can demonstrate a clear match to the project specification and provide dependable documentation, traceability, communication, and delivery planning. Start by confirming the complete product requirements, not just the strand diameter, then compare quotations using consistent technical and commercial assumptions. Resolve substitutions and system compatibility questions before issuing a purchase order. For your next step, prepare an RFQ schedule and send it to DALU for a project-specific supply discussion.